Plans for klia3! Cost overruns, shoddy work and what else? Isn’t twice enough?

—

klia2: maps, directions, diagrams, information…

The STILL SINKING Kuala Lumpur International Airport 2 (klia2)

AirAsia versus MAHB

klia2: Fuel leaks = Danger!

RM100million for the 1km ERL link between KLIA and klia2!

—

23 November 2015

Plans announced for new terminal at Kuala Lumpur International Airport

A new terminal is expected to be built at the Kuala Lumpur International Airport to expand its total capacity to 100 million passengers a year.

Plans announced for new terminal at Kuala Lumpur International Airport

Embedded image permalink

…
KUALA LUMPUR: A new terminal is expected to be built at the Kuala Lumpur International Airport (KLIA) to expand its total capacity to 100 million passengers a year, said Deputy Transport Minister Datuk Abd Aziz Kaprawi.

Airport operator Malaysia Airports Holdings Bhd (MAHB) is expected to submit a proposal for the airport’s third terminal in the next two to three years after detailed studies, he told Malaysian reporters on Malindo Air’s maiden flight to Perth, Australia.

He said last year, KLIA’s main terminal handled 23 million passengers a year, almost near its full capacity of 25 million passengers, while klia2 is also reaching its full capacity of 45 million passengers.

The government wants to leverage on Kuala Lumpur’s strategic location and make Malaysia a regional air transit hub, he said, pointing out the aviation industry’s bright prospects especially in ASEAN, India and China with the improved air connectivity wooing more visitors to Malaysia.

http://www.channelnewsasia.com/news/asiapacific/plans-announced-for-new/2286188.html?cid=twtcna

—

A new terminal is expected to be built at the Kuala Lumpur International Airport (KLIA) to expand its total capacity to 100 million passengers a year.

Deputy Transport Minister Datuk Abd Aziz Kaprawi says Malaysia Airports Holdings Bhd is expected to submit a proposal for the airport’s third terminal in the next two to three years after detailed studies.

Last year, KLIA’s main terminal handled 23 million passengers a year, almost near its full capacity of 25 million passengers, while klia2 is also reaching its full capacity of 45 million passengers.

—

Well, didn’t see this coming! Apparently, there are plans for to get a 3rd terminal:

Embedded image permalink
Embedded image permalink

—

This entry was posted in Uncategorized and tagged , , , . Bookmark the permalink.

Leave a Reply